NEWS: RECORD PREPARATION OF BOARDS!

In a difficult global context that affects the production and supply of certain products, we do everything we can to maintain the high level of service that is the strength of GONG. The latest example, 185 boards could be prepared within 48 hours by our teams in order to be shipped before the weekend: unpacked, padded, packed!

We repeat it regularly, but it is not an empty word: our priority is to provide top-of-the-range gear that is accessible to all so that you can make the most of your free time ;). This means, among other things, the most efficient delivery possible. This is exactly what Charline, Baptiste, Mathieu, David and their colleagues did. In less than two days, they stuck the pads on 185 boards and prepared their expedition! Indeed, the context of recent weeks (floods, covid and summer holidays) has prevented the usual good coordination of our partners which has forced us to receive pads and boards separately.
These are the hazards of any business in this anarchic context. But we are able to do everything internally regarding our products since we are the ones who create the products and their manufacturing methodology. In the event of a failure of a subcontracting link, we take over. And you can count on us to do a professional job!
1 comment
Bravo pour votre mobilisation et le travail effectué ! ça doit pas être facile tous les jours. Encore merci de nous produire du matos top !