FACTORY: INSTALLATION OF FCS II BOXES !!!

Back
Back
  • News
  • Surf
1
FACTORY: INSTALLATION OF FCS II  BOXES !!!

From the Shape template, Beryl draws out, with precision, on the hull the marks that will determine the location of the Fin Boxes. Then, using an FCS II Fin Box routing template and a router, he removes the material needed to create the hole that will accommodate the Fin Box housings. Finally, to ensure maximum solidity, Beryl will inject a mixture of fiberglass powder and micro-balloon resin into the holes before permanently installing the boxes.

Glasser: Béryl at the GONG Factory.

1 comment

Sent by par Olivier LEMOINE

Ca c’est pour des commandes spéciales ?
Les sorties d’usine (chinoises) ont leurs boitiers déjà fait ! Non ?

Leave a comment

Please note, comments need to be approved before they are published.